Engineered erection concepts
Every site is prepared ahead of time to select the lifting and assembly sequence that minimises crane hours and overall schedule.
- Ground pre-assembly wherever site layout permits
- Prior trial fit-up in our workshop
- Dedicated tooling and access equipment for every structure
